National Office Relocation
300+ employees relocated. 25+ offices. No two moves alike.
A running, multi-year program of office relocations, new office build-outs, and site closures, with several projects overlapping in timing at any given point, each one requiring its own vendor lineup, lease timing, and IT cutover plan.
300+ Employees

Roughly 25 offices needed to move, get newly built out, or close, each one different, with no two moves following the same playbook.
Some sites were straightforward relocations. Others were ground-up office builds, standing up a new space from the IT closet out to every desk. Others were closures, winding a site down cleanly and accounting for every piece of equipment that came out of it. No single checklist covered all three.
This also wasn't one project running at a time. Several relocations, builds, and closures ran on overlapping timelines, all pulling from the same pool of vendors, budget, and internal resources at once.
More than 300 employees were relocated over the life of the program, across offices nationwide.
This wasn't one relocation, it was a portfolio of them, moves, builds, and closures running at the same time, each with its own landlord, vendor list, and IT footprint. A miss on any one site meant a team without a working office on day one.
Three kinds of projects, often at the same time, across sites that didn't share a landlord, a vendor list, or a clock.
- Coordinating walkthroughs with vendors and third parties at every site, and getting floor plans, the IT closet build, and networking sign-off settled before a single box moved
- Negotiating lease timing with landlords to land a favorable move-in window instead of just the one that happened to be open
- Overlapping timelines: multiple relocations, builds, and closures running at once, competing for the same vendors, budget, and internal resources
- Operational risk on every site, downtime, vendor delays, and facility readiness, any one of which could leave a team without a working office on day one
Ran every site the same disciplined way, walkthrough to closeout, while carrying several of them at once.
Twenty-five-plus sites, moves, builds, and closures alike, running on overlapping timelines, and every one of them landed the same way: teams at their desks, systems live, and a closeout report on file to prove it.